|
Underground Train (Bangkok)
The recently
opened underground train system (officially called MRT - Mass Rapid transit)
operates from 05:00 am to midnight. It reaches from the Northern train
station of Bangsue to Hua Lumphong main railway station in a loop,
connecting with the Skytrain on 3 different stations, namely : Silom,
Sukhumvit and Chatuchak Park.
There have a
similar ticket system as the Skytrain (BTS) but both systems are for the
time being not compatible. All stations of the underground train can be
reached via ramps and elevators, if needed, or alternatively via escalators.
See combined
Route map






The MRT Bangkok Metro Underground
The 'impossible'
became a reality in April 2004. It had taken seven years to build,
comprising 21 kilometres of bored tunnels, with 18 simultaneously-built
stations, using top-down techniques up to 30 metres deep under the city's
major roads. The cost was approximately US$ 2.75 billion.
Officially called
the Mass Rapid Transit (MRT) and in Thai as rot fai fah mahanakhon
("metropolitan electric train") or more often as the rot fai tai din
("underground train") the line operates from 5am to midnight, and extends in
a wide loop from the main railway station of Hualumpong, then tracks back
via the Queen Sirikit National Convention Centre to the smaller rail station
of Bang Sue (pronounce Seu) to the north.
It has
interchanges with the Skytrain at Si Lom, Sukhumvit and Chatuchak Park
stations. To protect against periodic flooding, station entrances are
elevated above ground, and equipped with built-in floodgates. To prevent
accidents and suicides, a glassed-in Automatic Platform Screen Door
separates the platform and track, and opens only when the trains pull in and
stop. All stations feature lifts and ramps for disabled people.
As with the
Skytrain, there are a number of ticket types, which only need to be held
close to the ticket barriers to operate them, thanks to a proximity sensor.
Tokens are used for single journeys. An unlimited 1 day go-as-you please
travel ticket currently costs Baht 120. A joint ticketing system for the
Subway and Skytrain is planned.
MRTA prepares the parking lots for MRT passengers
MRTA has prepared the parking areas and other facilities for the MRT
passengers including two Park&Ride Buildings and seven subway stations.
In August 2004, the parking lots, retail shops, and other facilities
will be available for the passengers who want to park their cars and take
the subway for their destinations.
1.Two Park and Ride Buildings
The Park and Ride Building at Lat Phrao Station, a nine-storey building
located at Ratchada-Lat Phrao intersection, can accommodate 2,400 cars. The
passengers can walk along the underground walkway from the building to Lat
Phrao Station. There is a large supermarket on the underground floor for
those who want to stop for shopping. The ground floor is designed to provide
customer service including ticket-vending machines, intercom system, CCTV,
elevators, and public conveniences. The station also accommodates two floors
of shops, stalls for other commuters.
The other park and ride building is located at the Thailand Cultural
Centre Station between Soi Ratchadaphisek 6 and 8. The building has three
floors and accommodate 180 cars. This park and ride building also has shops,
stalls and other conveniences for MRTA passengers.
2. Parking Area
There are sample parking area at seven MRT stations: Sam Yan Station,
Sukhumvit Station, Phetchaburi Station, Thailand Cultural Centre Station,
Huai Khwang Station, Ratchadaphisek Station and Kamphaeng Phet Station,
Moreover, in the inbound Ratchadaphisek area, there are more air-conditioned
stores area and public conveniences for MRT passengers.
|